Web
Analytics
The news is by your side.

LNG Terminal

Senate committee calls for probe into ‘under-utilization’ of PGPC’s LNG Terminal 2

ISLAMABAD: The Senate Standing Committee on Petroleum in its meeting on Monday called for undertaking a probe into the of under-utilization of LNG Terminal 2 at Port Qasim Authority, ARY News reported. According to details, the Senate committee questioned as to why the Pakistan GasPort Consortium (PGPC) terminal is under-utilized and why power division doesn’t give adequate demands for gas production to the terminal. The committee expressed serious concerns as to why such a huge terminal was built and wrong assumptions…

PM Abbasi says efforts afoot to overcome energy challenges

KARACHI: Prime Minister Shahid Khaqan Abbasi said on Monday concerted efforts are being made to meet the energy challenges facing the country. He said this while addressing the inaugural ceremony of second LNG terminal at Port Qasim in Karachi on Monday. The terminal has been completed at a cost of 50 billion rupees. The premier said LNG terminals will help meet the growing demand of energy as more gas-based power plants were being installed. Abbasi said construction of LNG terminals will boost economy and industry…

PM Abbasi arrives in Karachi on two-day visit

KARACHI: Prime Minister Shahid Khaqan Abbasi on Sunday arrived here on a two-day visit. The premier landed at the Karachi airport where he was received by Sindh Chief Minister Syed Murad Ali Shah and Governor Muhammad Zubair Umar. He will attend a reception hosted by Pakistan Gas Port Consortium Limited (PGPC) and will also inaugurate a Liquefied Natural Gas (LNG) import terminal. This is his fourth visit to the economic hub of the country after taking oath as prime minister in August in the wake of former prime…

PM Abbasi inaugurates LNG terminal at Port Qasim

KARACHI: Prime Minister Shahid Khaqan Abbasi on Sunday inaugurated a liquefied natural gas (LNG) terminal at Port Qasim. Addressing the inauguration ceremony, the premier said the government has ensured transparency in all development projects in the country. He said the terminal has been completed within the record time of 330 days, adding the bidding process for LNG terminal was completely transparent. PM Abbasi said the terminal with a capacity to handle 750 million standard cubic feet gas per day was second of…